Working with the Emerald fund development company and David Baker (architect of record for the building), S/U/M was asked to provideĀ full design/build services to renovate the existing lobby area of the SOMA residential building. The goals of the renovation: diversify the needs for enhanced reception and hospitality services offered to the residents of the building, while respecting the heavy foot traffic of the lobby during construction by using prefab technology.
Industry partner:
Mackie Builder- Matthew Pigman
This entry was posted on Wednesday, April 8th, 2009 at 7:56 pm and is filed under design, fabrication, slider. You can follow any responses to this entry through the RSS 2.0 feed.
Comments are closed.
Powered by WordPress
Design by Graph Paper Press
Subscribe to entries
Subscribe to comments
All content © 2010 by S / U / M